MNDF Coast Guard Building

MNDF Coast Guard Building

Sector
Civil & Infrastructure
Location
Malé & Hulhumalé
Project
Demolition & enabling works
Scope
Demolition / Sheet piling / Excavation
Client
Rainbow Construction
Year
2019
Services

Demolition of the existing structure, followed by sheet piling and excavation to prepare the site for new construction, carried out within a secure and tightly constrained urban site.

The challenge

Controlled deconstruction on a major commercial street inside a restricted area near the Presidential Palace, with no room for conventional demolition.

Our approach

A small excavator was craned onto the structure and the building taken down top-down, floor by floor, with material removed continuously by vessel to Thilafushi. Sheet piling and excavation followed to prepare the site.

Outcome

Site cleared, piled and excavated for new construction without incident in a highly sensitive location.